Method Functional Safety
Group Home About us Contact us Terms & Policies
 +44 (0)1462 713313  support@methodfs.com

SIS and SIF Decommissioning

Creating FSA 1 - 5 for clients across the UK in process industries.

The Solution =Method

Managing SIS and SIF Decommissioning

While IEC 61511 devotes a separate clause to SIS Decommissioning, which highlights particular requirements for this activity, following the approach defined for “Modifications” will normally satisfy all those requirements – and has the main benefit that this avoids the need to set up a different set of procedures just for Decommissioning.

Note - that “Decommissioning” includes removal of a single SIF from a SIS, it isn’t restricted to Decommissioning of the entire process, though that too would be in scope.

What =Method can do for you

  • At =Method, we’d treat SIS or SIF Decommissioning as if it were a modification.
  • =Method consultants create FSA 1 - 5 for clients across the UK in process industries.

Technical author

Dil Wetherill

CEO - Method Safety and Security

Dil launched Method Functional Safety in 2013. He now delivers training courses and provide consultancy on all aspects of functional safety.

View Dil’s full profile

4 x Recent =Method Decomissioning projects

A Stage 5 Functional Safety Assessment for a modification to the storage vats (tanks) for a whisky manufacturing site.

Industry: Brewing and Distilling
Topic: Functional Safety Assessment (Stage 5)

Project to to carry out a Stage 5 Functional Safety Assessment on a modification being carried out to a Gas Field Refrigeration Project.

Industry: Oil and Gas Offshore
Topic: Functional Safety Assessment (Stage 5)

Stage 5 Functional Safety Assessment (FSA 5) on an offshore natural gas platform located in the southern North Sea.

Industry: Oil and Gas Offshore
Topic: Functional Safety Assessment (Stage 5)

1-day review to implement modification to remove a SIF

Industry: FMCG
Topic: Functional Safety Assessment (Stage 5)