Project to carry out Proof Tests on a Spray Dryer.
Industry: Chemical
Topic: Operation and Maintenance
Project to author Proof Test Procedures for 15 Safety Instrumented Functions. The information generated for the validation (site acceptance testing) of the SIF’s was used as the base data for the proof test procedures, in the absence of SRS data.
Industry: Agrochemical
Topic: Operation and Maintenance
Development of an Operations and Maintenance plan is to control the operation, testing, inspection and maintainenance of the SIS so that the required SIL and the designed functional safety are maintained according to the SRS.
Industry: FMCG
Topic: Operation and Maintenance
Drafting a Safety Plan to cover the Operations and Maintenance Phase of IEC 61511, covering typical activities such as calibration, replacement of parts, inspection, proof testing and making changes to operations and maintenance procedures. Also covers monitoring of relevant KPI’s and the responses required to faults and failures.
Industry: Chemical
Topic: Operation and Maintenance
Proof test of spray dryer SIF
Industry: Mining / Metal / Cement
Topic: Operation and Maintenance
Proof testing spray dryer SIFs
Industry: Mining / Metal / Cement
Topic: Operation and Maintenance
Proof test verification for drinks industry application
Industry: Brewing and Distilling
Topic: Operation and Maintenance
Installed systems functional safety management procedures
Industry: Chemical
Topic: Operation and Maintenance
Workshop on installed / legacy system management
Industry: Power
Topic: Operation and Maintenance
Developing O&M procedures for management of installed SIS
Industry: Oil and Gas Onshore
Topic: Operation and Maintenance
Developing O&M procedures for ink manufacturing process
Industry: Chemical
Topic: Operation and Maintenance
Proof testing spray dryer SIFs
Industry: Mining / Metal / Cement
Topic: Operation and Maintenance
Providing advice to FMCG client on operations and maintenance approach.
Industry: FMCG
Topic: Operation and Maintenance