Hazard Study 2 (HazID)

Early-Stage Hazard Identification Using a Top-Down Approach

The Solution =Method

What is Hazard Study 2?

A hazard study 2 (HazID) aims to identify the main process safety hazards in the process and ensures that appropriate safeguards have been put in place. It asks questions like:

  • Is it possible to have a fire/explosion? And what could be the causes of that?
  • Could we overfill one of our tanks?, and if so, what would the consequences be?
  • Are there any situations which could result in an overpressure?
  • Could we expose our operators to toxic substances?

The main difference between HS2 and HazOp (HS3) is that HS2 uses a “top-down” approach, whereas HazOp uses a “bottom-up” approach. HS2 also requires less detailed design information than HS3, and takes less time to do. Carrying out a HS2 saves time and money for the project by hopefully identifying any serious issues before the design has progressed too far. To get the best value from HS2, it should be carried out once process flow diagrams (PFDs) are available, but before full piping & instrumentation diagrams (P&IDs) have been produced. Sufficient time should be allowed in the project program to allow actions raised at HS2 to be completed before the design is frozen for HazOp.

What =Method can do for you

HS2 / HazID decision support
Help you to decide if HS2 is needed for your project, and if so, how to carry it out.
Experienced study facilitators
Provide experienced study facilitators for your HS2 / HazID study.
Training and mentoring support
Train and give mentoring support to aspiring Hazard Study Leaders and provide HazOp Team Member training.

Technical author

David Sparkes

Technical Director, Method Process Safety

David is an experienced process engineer with a solid background in plant support, capital projects and control system design.

View David’s full profile

4 x Recent =Method Process Safety Hazard Study 2 projects

HS2 for Semiconductor Facility Gas Supply System

Industry: Other
Topic: Hazard Study 2 - Hazard Identification

Project to facilitate a Hazard Study 2 (HazID) on the installation of new saturated steam package boilers.

Industry: Mining / Metal / Cement
Topic: Hazard Study 2 - Hazard Identification

A Process Risk Assessment 2 (PRA2) study and associated report for a new herbicide process, with raw material supply from isotankers. The PRA2 was carried out by a multi-disciplinary team comprising representatives from the client and =Method wit...

Industry: Agrochemical
Topic: Hazard Study 2 - Hazard Identification

Hazard Study

Industry: Chemical
Topic: Hazard Study 2 - Hazard Identification