Method Process Safety
Group Home About us Contact us Terms & Policies
 +44 (0)1462 713313  support@methodprosafe.com

Plant Operation

Process Safety Management, HS6 and Ongoing Safety Assurance

The Solution =Method

By this stage, commissioning is complete and the plant has been moved on to normal operation.

The operations team will be responsible for the operation and maintenance of the plant and teething problems are worked out.

During the operational phase, it is important to review the measures that were put in place at the design stage to ensure that they are working as intended. Many companies choose to carry out a hazard study 6 (HS6) in early operational lifecycle to ensure that the level of safety is appropriate and that the original design assumptions were valid.  See Hazard Study 6.

After HS6 (typically carried out within the first few months of operation), the focus moves towards confirming the continued safe operation of the process and the associated safety systems by way of a “Stage 4 Functional Safety Assessment” (FSA4) as per IEC 61511 and carrying out review (or “revalidation”) of the safety studies (HazOpHazard & Operability Study /LOPALayer of Protection Analysis ).

Five-Year Hazard Study Revalidation

After 5 years of operation. This review phase captures any changes made to the plant over the years of operation and reviews the safeguards that were put in place, to ensure they are being managed effectively. This 5-year timeframe gives sufficient operational experience to make the review worthwhile.

What =Method can do for you

Five-yearly hazard study reviews
Provide experienced study facilitators for 5-yearly hazard study reviews.
Independent verification
Carry out independent verification of hazard studies carried out by others (verification is a requirement of IEC 61511).
Stage 4 Functional Safety Assessments
Carry out Stage 4 Functional Safety Assessments.

Technical author

David Sparkes

Technical Director, Method Process Safety

David is an experienced process engineer with a solid background in plant support, capital projects and control system design.